AI Agent Hub
Back to skills
Guangdong Highway Bidding Document Drafting Assistant 2025 icon

Guangdong Highway Bidding Document Drafting Assistant 2025

Business Operations Updated 2026.08.30

Paste the following prompt into your AI chat to install this skill:

Please follow https://skillhub.cn/install/skillhub.md to install @user_b818ef37/gd-highway-bidding-2025.

About this skill

Problem to solve

Bidding for Guangdong highway projects spans construction, prequalification, design, design consulting, supervision, and central laboratory testing. Under the 2025 template set, drafters must choose the correct annex, keep mandatory main text intact, fill pre-attachment fields, verify evaluation-method scope, qualification conditions, and fair-competition review. Misapplying comprehensive scoring to ineligible bridge/tunnel projects or missing the 15 review points can make the document unacceptable.

How it works

  • Clause lookup: maps terms to files such as 02-Fair-Competition-Review.md and 04-Construction-Evaluation-Methods.md, then returns clauses with source references.
  • Drafting guidance: confirms bid type, qualification route, evaluation method, chapter structure, and qualification conditions before producing section-level notes.
  • Benchmark price calculation: identifies evaluation price, discount rate, and benchmark price method, then shows formulas and intermediate results.
  • Review checks: walks through 15 fair-competition points, gives corrections, conclusions, and signature reminders.

It also enforces guardrails: comprehensive scoring is limited to extra-large bridges, long tunnels, bridge/tunnel ratio ≥35%, pavement work, and highway expansion/reconstruction civil works. Credit-level usage caps, bond reductions, and committee size limits are distinguished by project conditions.

Boundaries

Intended for new or expanded/reconstructed expressways, Class I roads, and Class II roads in Guangdong. Drawings, technical specifications, detailed bill of quantities, and project-specific contract values still require project-specific work. Sold or filed documents should generally continue using the original template; non-Guangdong projects are outside direct scope.

Use Cases

  • When drafting construction bidding documents for a Guangdong expressway, check whether comprehensive scoring applies and complete the evaluation section.
  • When preparing construction prequalification, distinguish pass-system and limited-number qualification and outline the announcement and instructions.
  • Before filing or publication, check the document against the 15 fair-competition points for exclusionary clauses.
  • When drafting supervision or central laboratory bids, retrieve commission requirements, testing-plan scoring, and testing-qualification conditions.

Best For

  • Tender agents drafting Guangdong expressway or Class I/II construction bid documents who need to confirm templates, evaluation methods, and front-attachment points.
  • Technical leads handling design or supervision bidding who need to check qualifications, track record, staffing, and evaluation sections.
  • Legal or commercial reviewers completing the 15-point fair-competition check before publication and documenting the conclusion.
  • Project engineers preparing Guangdong road bid responses who need to look up likely qualification conditions and evaluation rules.