AI Agent Hub
Back to skills
General Sub-Project Construction Plan Review Guide icon

General Sub-Project Construction Plan Review Guide

Professional Updated 2026.08.29

Paste the following prompt into your AI chat to install this skill:

Please install @user_d9e8cccd/general-engineering-review using https://skillhub.cn/install/skillhub.md.

About this skill

Problem

Many construction plans for ordinary, non-critical sub-projects fail not because safety is absent, but because they lack site-specific detail: chapters are copied, code versions are outdated, parameters are missing, and safety measures remain generic. general-engineering-review turns review of these plans into concrete checks for common specialties, including earthwork, piling, waterproofing, concrete, rebar, masonry, finishes, roofing, MEP, elevators, and municipal landscaping.

How It Works

The skill follows the typical plan structure and uses a chapter-by-chapter review path:
- Overall review: checks completeness, consistency, site relevance, and whether vague phrases replace actionable procedures.
- Basis of preparation: verifies drawings, construction organization design, contract, codes, standards, and regulations, with attention to current code versions.
- Project overview and readiness: confirms participating parties, design parameters, site conditions, equipment, materials, testing, and temporary facilities.
- Main construction methods: cross-checks process flow, operation parameters, equipment, work at height, hot work, temporary power, confined spaces, and other risk controls.
- Quality and other requirements: reviews acceptance methods, defect prevention, safety, fire prevention, environmental measures, seasonal measures, and emergency response.

Scope

This skill is for ordinary, non-critical sub-project construction plan review. It does not replace review of hazardous large-scale works, site surveys, structural calculations, or licensed professional judgment. High-risk work such as deep excavations, high formwork, large lifts, or complex confined spaces should be reviewed under the corresponding specialized or higher-risk requirements.

Use Cases

  • When reviewing a roofing waterproofing plan, check hot work, temporary power, and confined-space controls are specified.
  • When compiling review notes for a concrete plan, verify pump-pipe fixing, placing boom safety, and acceptance requirements.
  • When checking a rebar plan, confirm rebar chair design, welding hot-work controls, and code version consistency.
  • When drafting a review checklist, break basis, overview, readiness, and quality requirements into itemized checks.

Best For

  • Project technical leads doing initial review of ordinary sub-project plans who need to locate missing sections and vague measures quickly.
  • Construction plan engineers preparing schemes who want to check basis, methods, and quality requirements before submission.
  • Safety or quality engineers in project reviews who need to verify height, hot work, temporary power, and confined-space risks item by item.
  • Consultants or supervisors consolidating multi-specialty review comments who need to turn defect lists into trackable checklists.