AI Agent Hub
Back to skills
Guangzhou Government Building Estimate 2025 icon

Guangzhou Government Building Estimate 2025

Professional Updated 2026.08.30

Paste the following prompt into your AI chat to install this skill:

Follow https://skillhub.cn/install/skillhub.md to install @user_b818ef37/gz-building-estimate-2025 in your AI assistant.

About this skill

Problem

Guangzhou municipal government investment projects often need building cost estimates during project proposal and feasibility study stages. Generic experience or non-local indicators can miss hospital, school, or affordable housing specifics and may double-count or omit items such as green building, prefabrication, power distribution, elevators, and sponge city measures. This skill is built around the Guangzhou 2025 guidance for building engineering costs, with measurement rules, estimate templates, and specialized indicators kept as citable resources/ files for model use.

How It Works

The skill supports two working modes:

  • Rough estimate: intended for early concepting, quick ballparking, or preliminary feasibility checks.
  • Itemized detailed estimate: intended for feasibility reports, project applications, or more precise budgeting.

Core capabilities include:

  • Reading specialized indicator files such as 04-医院专项指标.md, 05-学校专项指标.md, and 06-住房专项指标.md, then falling back to 03-通用技术经济指标.md when an item is not listed.
  • Checking project characteristics such as building type, height, structure, prefabrication rate, and green building rating.
  • Applying validation rules for green building plus ultra-low energy, prefabricated construction, power distribution/elevators, and sponge city items to reduce duplicate or missing entries.

The output is meant to be traceable: indicators point back to resources/ files, and unlisted items should be flagged for manual verification instead of being invented.

Limits

The skill applies only to Guangzhou municipal-level government investment building projects. It focuses on building engineering costs and does not estimate other construction costs such as supervision, design, or consulting fees. Model-suggested ranges still require professional confirmation. Projects with large spans, high spaces, irregular structures, non-reinforced-concrete structures, or special fit-out should be treated as outside the guidance and validated case by case.

Use Cases

  • Prepare school project proposal or feasibility estimates by splitting building costs using the 2025 Guangzhou guidance.
  • Check hospital indicator sheets against general indicators to avoid duplicate green building or prefabrication charges.
  • Run rough estimates for affordable housing, apply housing-specific indicators, and flag height ranges outside guidance limits.
  • Prepare application materials by compiling itemized estimates and marking missing indicators for source-document verification.

Best For

  • Cost consultants preparing Guangzhou government building estimates, who need local indicator checks and item coverage.
  • Hospital or school project leads needing early-stage building cost estimates for feasibility reports.
  • Reviewers validating green building, prefabrication, and power distribution line items in estimate sheets.
  • Workflow engineers integrating structured resource files into LLM pipelines with traceable estimate outputs.