AI Agent Hub
Back to skills
Weak Current Bid Technical Proposal Writer icon

Weak Current Bid Technical Proposal Writer

Business Operations Updated 2026.08.30

Paste the following prompt into your AI chat to install this skill:

Follow https://skillhub.cn/install/skillhub.md to install @user_7a5540f4/bid-tech-writer-skillhub.

About this skill

Problem it solves

Weak-current and intelligent-building bids often fail because technical proposals cite standards imprecisely, list vague equipment parameters, turn construction methods into slogans, or mishandle deviation tables. This skill constrains drafting to verifiable knowledge-base results instead of relying on model memory.

How it works

It queries the 《Weak Current Intelligentization AI》 knowledge base through mcp__ima-mcp before answering. It uses multiple keyword sets to retrieve GB standards, equipment specifications, budget rates, construction methods, and bid templates, then cross-checks results and cites sources. If information is missing, it says the item is not indexed rather than inventing clauses, model numbers, or prices.

The workflow includes:
- Confirming project scope, subsystems, scale, tender clauses, and budget
- Selecting a chapter outline from covered areas
- Retrieving standards, professional data, Excel archives, and Word archives
- Drafting system overview, design basis, key parameters, equipment selection, construction method, and acceptance criteria
- Running a bid-risk self-check and marking placeholders

It covers structured cabling, video surveillance, building automation, optical transmission, data centers, public broadcast, and parking management, while emphasizing bolded key parameters, non-exclusive brands, and manual completion of personnel certificates and project history.

Limits

Use it for drafting or reviewing weak-current technical bids, especially when standard citations, parameter tables, or obvious disqualification risks need cleanup. It does not replace tender-agent review, vendor confirmation, qualification proof, or legal sign-off; model numbers, prices, certificates, and case records must come from tender documents and real project materials.

Use Cases

  • Drafting a weak-current office bid, generate chapter outlines for cabling, surveillance, and BAS with cited GB standards.
  • Preparing deviation tables, rewrite an H.265 nonconformance as a vendor-backed commitment to reduce disqualification risk.
  • Writing construction organization, produce schedule, labor, quality control, and safety briefing tables for a 3-month project.
  • After drafting, check qualifications, cases, certificates, duration, warranty, and deviations to output a bid-risk report.

Best For

  • Weak-current bid engineers: organizing equipment lists and client requirements into a complete technical proposal.
  • Bid managers: quickly verifying standard citations, parameter responses, and disqualification risks to reduce scoring losses.
  • Presales solution engineers: creating requirement-analysis chapters to clarify subsystem scope when client needs are vague.
  • Bid document specialists: generating deviation tables, construction plans, and self-check lists with consistent formatting.